Braun Intertec partners with COMMAND Center™ to reduce the amount of time required on the jobsite, simplify the setup process, and increase data reliability
In this video case study, Braun Intertec shares how COMMAND Center™ concrete temperature and maturity system reduced the amount of time
Ferreira Construction Uses COMMAND Center™ to Prevent Thermal Cracking in Bridge Replacement Project
The Pulaski Skyway Bridge in Kearny, New Jersey was exhibiting thermal cracking and major spalling of the concrete support piers.
Kent Companies Uses COMMAND Center™ Wireless to Monitor Internal Concrete Temperatures in Cold Weather Placement
Kent Companies needed to continuously monitor concrete temperatures when building a 16-story high rise in Grand Rapids, Michigan. Most concrete
COMMAND Center™ Used on World’s First S-Shaped, Single-Tower Suspension Bridge
The city of Dublin, Ohio says the Dublin Link pedestrian bridge is the world’s only and longest single-span, single-tower, S-shaped
S. T. Wooten Uses COMMAND Center™ for Temperature Monitoring in NCDOT Project
S.T. Wooten Corporation used COMMAND Center™ on a North Carolina Department of Transportation (NCDOT) project in Havelock, NC. The project
COMMAND Center™ Used During Super Bowl Stadium Construction
Image courtesy of mercedesbenzstadium.com. The COMMAND Center™ system was used to measure maturity of fresh, in-place concrete during construction of
O. Trevino Drastically Expedites Schedules, Improves Safety Using COMMAND Center™ for Pavement Repair
Photo courtesy of O. Trevino Construction. Texas-based O. Trevino Construction specializes in concrete paving and highway maintenance. The team knows
COMMAND Center™ Used to Measure Mass Concrete Placement Temperatures in Signature V-Pier Bridges
Rendering by Rosales + Partners. Three unique V-pier bridges are being constructed over the Trinity River in Fort Worth, Texas. The